Logo
SL Project Title Sector Client Period
121 Engineering Consultancy Services for “Installation of 50,000 Smart Pre-Paid Gas Meter in JGTDSL Franchise Area” (Smart Pre-paid Gas Meter) Power & Energy Jalalabad Gas Transmission and Distribution System Limited. 2021 - 2024
122 Engineering Consultancy Services for Installation of 60,000 Smart Pre-paid Gas Meter in Karnaphuli Gas Distribution Company Ltd. (KGDCL) franchise areas under Natural Gas Efficiency Project (Loan No. BD-P78). Financed by JICA Power & Energy Karnaphuli Gas Distribution Company Ltd. (KGDCL) 2015 - 2019
123 Consulting services for” Sub-Soil Investigation and Total Station Based Topographical Survey with Fixing up Latitude and Longitude by using GPS For Construction of Bridge/ Culvert Project up to 15m length in the Rural Road” (Package No: 33) Social Development Ministry of Disaster and Relief 2020
124 Training on Safety Net Program Operations & Public Information Campaign under Safety Net Systems for the Poorest (SNSP) Project (IDA/WB Credit No.: -5281-BD & Project ID: P132634) Social Development Ministry of Disaster and Relief 2016 - 2021
125 Training Exercises and Drills (TED) Program under Bangladesh Urban Resilience Project (URP DDM Part)-IDA/WB Credit # 5599 (Package No.: BD-DDM-29946-CS-QBS) Social Development Ministry of Disaster and Relief 2018 - 2020
126 “Increasing Income and Creating Employment through Production and Marketing of Imitation Gold Jewelry” under ‘Promoting Agricultural Commercialization and Enterprises (PACE) Project” of PKSF-IFAD Loan No. 2000000722 & Grant No. 2000000835-Impact Study Social Development Palli Karma Shohayok Foundation (PKSF) 2022 - 2023
127 Tracer Study of Skills for Employment Investment Program (SEIP) Graduates (Tranche 2)-(Package No.: FD/SEIP/SD-26/535/2020)-ADB Loan No. 3468-BAN Education & Training Skills for Employment Investment Program (SEIP) 2022 - 2023
128 Diagnostic Studies to Assess Female Traders and Entrepreneurs Export Potential in the ICT Sub-Sector under Bangladesh Regional Connectivity Project-1 (BRCP)-1 (Package No. BRCP1/MOC/SD-10) Information & Communication Technology Ministry of Commerce 2021 - 2022
129 Integrated Feasibility Study (FS) For “Physical Infrastructure Modernization, New Digital Device Manufacturing/Assembling Plant Establishment and Enhancing Production/ Assembling capability of existing Plants of Telephone Shilpa Sangstha Ltd. (TSS)” Information & Communication Technology Telephone Shilpa Sangstha Ltd. (TSS) 2023
130 “The Sustainable Social in Chittagong Hill Tracts Area (2nd Revised)”- In-depth Monitoring Social Development Implementation, Monitoring and Evaluation Division (IMED) 2022

Design & Developed by 2A IT Limited